IT IS DONE!
For the last three weeks of school I have been very busy, my design projects were for both structural and geotechnical engineering. For structural my group designed a 73 meter long bridge over a river and for geotechnical another group designed the foundation for a 14 story building being constructed on the U of A campus. The structural project required an extreme amount of work, but in the end it paid off. This is a 3D video of the drafting that I did in AutoCAD.
7 comments:
Wahoo!!! We are so proud of you!!
It literally paid off. Chris neglected to mention that his structural group placed second and won $500!!
Congratulations Chris! We know you've worked so hard and we are so proud of you!
Congrats.
Congratulations, job well done!
Now when you play making bridges, you can get paid!
Congrats Chris
Congratulations!
Post a Comment